SPC Floor Installation Guide

Mar 14, 2025 Leave a message

1. Floor treatment:

    Ensure the floor is flat, dry, clean, and free of debris and gravel. The height difference of the floor should not exceed 3 millimeters per 2 meters, and any unevenness should be polished or filled, otherwise, the floor is prone to hollow and curl.

 

3142

 

2. Temperature adaptation:

    Before installation, place the floor indoors for at least 3 days to adapt it to the indoor environment of 18℃ - 29℃, avoiding direct sunlight and large temperature changes.

 

3. Measurement calculation:

    Calculate the required amount of flooring based on the room area, allowing for a 5%-8% wastage rate to prevent color mismatch in case of restocking.

 

4. Laying moisture-proof film:

    Lay a moisture-proof film of more than 2.0 mm on the ground, align the film without overlapping, seal the joints with waterproof adhesive tape, and leave a margin of 5 cm around the walls. If using solid wood skirting boards, extend above the walls by more than 50 mm.

 

3143

 

5. Dry laying and formal laying:

    Dry laying first, arrange according to texture and color, pick up the floor with large color difference or messy texture and lay it in a hidden place. Lay the first row from the side of the door, leave a 4-10 mm expansion joint between the wall and the floor. Use "long first, short later, press first, push later" to install, and the subsequent rows are inserted into the tenon and mortise in turn, and the rubber hammer can be used to assist if there is a gap. The irregular area is marked first and then cut.

 

6. Finishing and installing the buckle strip:

    The last row is well finished, the buckle strip is installed, ensuring that the buckle strip is perpendicular to the door frame, the screws are tightened, stable without noise, and the bonding is aesthetically pleasing.

 

31453146

31473148